HUBCO Thar Plant — Digital Twin

IIoT TELEMETRY & PREDICTIVE MAINTENANCE MONITOR

SYSTEM RUNTIME 412d 04h 12m 33s
Unit Location Thar Block II, Sindh
Megawatt Output
0.00 MW
GEN SPEED: 3000 RPM (50 HZ)
Overall Plant Health
100.0%
STATUS: OPTIMAL
AI Failure Probability
0.0%
PREDICTIVE ENGINE: RANDOM FOREST

Turbine Temperature Gauge

0.0 °C

Rotor Vibration & Oil Pressure (Last 60 Mins)

Active Telemetry Log (Real-time Filtered Alert Engine)

Timestamp Core Temperature Rotor Vibration Oil Pressure MW Output System Status