HUBCO Thar Plant — Digital Twin
IIoT TELEMETRY & PREDICTIVE MAINTENANCE MONITOR
SYSTEM RUNTIME
412d 04h 12m 33s
Unit Location
Thar Block II, Sindh
Megawatt Output
0.00 MW
GEN SPEED: 3000 RPM (50 HZ)
Overall Plant Health
100.0%
STATUS: OPTIMAL
AI Failure Probability
0.0%
PREDICTIVE ENGINE: RANDOM FOREST
Turbine Temperature Gauge
Rotor Vibration & Oil Pressure (Last 60 Mins)
Active Telemetry Log (Real-time Filtered Alert Engine)
| Timestamp | Core Temperature | Rotor Vibration | Oil Pressure | MW Output | System Status |
|---|